Forklifts are essential material handling equipment that play a significant role in supporting operational activities in manufacturing companies. The high intensity of forklift usage increases the risk of equipment failure, resulting in higher downtime and reduced operational effectiveness. This study aims to analyze the operational effectiveness of Forklift 1 using the Overall Equipment Effectiveness (OEE) method and to propose maintenance improvements to enhance forklift reliability and operational performance. This research employs the Overall Equipment Effectiveness (OEE) method, which consists of three main indicators: Availability Rate, Performance Efficiency, and Quality Rate. The data were collected through observations, interviews, documentation, and historical records of Forklift 1 operations and maintenance. The results indicate that before the proposed maintenance improvements were implemented, the OEE values were relatively low, reaching 36.9% in October, 63.8% in November, and 18.8% in December. After implementing a preventive maintenance schedule based on 540 operating hours, the OEE values improved significantly to 99.8% in January, 81.2% in February, and 99.8% in March. These findings demonstrate that the implementation of the OEE method effectively improves forklift operational performance by reducing downtime, increasing equipment reliability, and optimizing maintenance scheduling. Therefore, the OEE method can serve as an effective reference for improving productivity and operational efficiency in manufacturing companies. 

Downloads

Download data is not yet available.

References

[1] Adellia, A. (2025). Penerapan total productive maintenance dengan metode overall equipment effectiveness untuk mengurangi downtime pada mesin austof dan grabe loader dalam perspektif bisnis islam.

[2] Albar, G., Hakim, R., Nurlaila, Q., Safii, M., & Hasibuan. (2024). Implementation of overall equipment effectiveness to increase forklift productivity at PT. Hakim Bima Prima. 01(01), 8–12.

[3] Anggraeni, S. N., Dewanto, D. L., & Jaya, S. (2025). Analisis Overall Equipment Effectiveness (OEE) dan Failure Mode and Effect Analysis (FMEA) pada mesin packer. 4(1), 18–23.

[4] Asbari, M. (2026). Systematic literature review: Implementasi overall equipment effectiveness (OEE) terhadap kinerja industri manufaktur di Indonesia. 1(1), 67–88.

[5] Asshiddiqie, M. D., & Purwaningsih, R. (2023). Analisis efektivitas kinerja mesin forklift TCM menggunakan metode overall equipment effectiveness dan six big losses untuk meningkatkan efektivitas pergudangan pada proses bongkar muat (PT. Krakatau Argo Logistics).

[6] Gaol, Y. L., & Irwan, H. (2026). Analisis risiko kegagalan hydrotest pada line pipe system menggunakan metode failure mode and effects analysis (FMEA).

[7] Geun Lee, J., Sang Kim, Y., & Hyun Lee, J. (2023). Preventing forklift front-end failures: Predicting the weight centers of heavy objects, remaining useful life prediction under abnormal conditions, and failure diagnosis based on alarm rules. Reliability Engineering & System Safety, 234, 109151. https://doi.org/10.1016/j.ress.2023.109151

[8] Lasalewo, T., & Junus, S. (2024). Efektivitas alat angkut fixed crane menggunakan metode overall equipment effectiveness (OEE) di PT. Pelindo (Persero) Region IV Gorontalo. 2(2), 64–73.

[9] Lukman, D., Akbar, A., & Kusuma, N. (2025). Analisis perawatan mesin aftertreatment menggunakan metode overall equipment effectiveness (OEE) dan six big losses untuk meningkatkan efektifitas mesin pada PT. XYZ. 2(2), 868–877.

[10] Nugroho, A., Program, D., Teknik, S., & Batam, U. P. (2021). Analisis nilai overall equipment effectiveness pada mesin wheeloader Liugong CLG-856 memberikan informasi keefektifan peralatan untuk mengidentifikasi kerugian dan melakukan perbaikan. 3.

[11] Prabowo, H. A., Suprapto, Y. B., & Farida, F. (2024). The evaluation of eight pillars total productive maintenance (TPM) implementation and their impact on overall equipment effectiveness (OEE) and waste. International Journal of Technology, 22(1), 13–18. https://doi.org/10.14716/ijtech.v22i1.

[12] Purba, H. H., Jaqin, C., Hasibuan, S., & Amrina, U. (2024). Analysis implementation of overall equipment effectiveness (OEE) in electronic component manufacturing industry. Journal of Industrial Engineering and Management Research, 2, 18–25.

[13] Ramdhani, A., Maulana, M. H., Nasution, R. H., & Prastyo, Y. (2024). Productivity analysis using total productive maintenance and overall equipment effectiveness (OEE) at automotive manufacturing industry. International Journal of Engineering Research and Technology, 9(12), 2710–2717.

[14] Robbi, N. (2023). Analysis keandalan untuk meningkatkan efektivitas penggunaan forklift dengan metode reliability analysis dan machine’s effectiveness. 9(2), 233–246.

[15] Rohmatin, Y. Y., & Wahyuni, R. S. (2022). Forklift performance analysis using overall effectiveness equipment (OEE) method. Journal of Industrial Engineering Research, 7, 67–76.

[16] Sahara, S., Ananda, S., & Suyadi, D. (2024). Analisis efektivitas alat berat pada kegiatan bongkar muat di lapangan penumpukan sementara. 17(02), 127–136.

[17] Sidiq, A., & Irwan, H. (2026). Analisis dan pengendalian risiko kerusakan insulasi kabel pada hazardous area oil and gas menggunakan metode HAZOP dan Fault Tree Analysis (FTA).

[18] Simanungkalit, P., Yasra, R., & Widodo, W. (2026). Perencanaan sistem perawatan alat angkat kapasitas 5 ton dengan metode preventive maintenance (studi kasus PT. Trikarya Alam). 4(1), 47–57.

[19] Suhendra, R., & Betrianis. (2025a). Measurement of overall equipment effectiveness as a basis for manufacturing process improvement in production lines. Journal of Industrial Engineering, 91–100.

[20] Suhendra, R., & Betrianis. (2025b). Pengukuran nilai overall equipment effectiveness sebagai dasar usaha perbaikan proses manufaktur pada lini produksi (studi kasus pada stamping production division sebuah industri otomotif). 91–100.

[21] Tiara, D. P., Rosmadenis, P. S., & Wahyudin, W. (2023). Analisis pemeliharaan mesin pulper menggunakan metode total productive maintenance dengan pendekatan overall equipment effectiveness di Kedai Kopi Aceng. VIII(2), 5191–5196.

Downloads

Published

2026-08-06

How to Cite

Ariyanto, D., & Irwan, H. (2026). Quality Assurance Analysis Using The Six Sigma Dmaic Method To Reduce Product Defects. International Journal of Science and Environment (IJSE), 6(3), 45–55. https://doi.org/10.51601/ijse.v6i3.776

Issue

Section

Articles