Risk Analysis And Mitigation Strategies For MRT (Mass Rapid Transit) And LRT (Light Rail Transit) Construction Projects In Jakarta
Downloads
Abstract
The construction projects of Mass Rapid Transit (MRT) and Light Rail Transit (LRT) in Jakarta are highly complex and therefore prone to various risks that may affect project performance. Consequently, it is necessary to identify dominant risk patterns, analyze the influence of risks on project performance, and formulate risk mitigation strategies. This study employed the Severity Index (SI) method to determine risk severity, a Risk Matrix to map risk levels, multiple linear regression analysis to examine the influence of risks on project performance in terms of time, quality, and cost, and Fault Tree Analysis (FTA) to identify the root causes of dominant risks. The results identified several dominant risks categorized as high risks in MRT and LRT construction projects in Jakarta. The regression analysis also showed that, partially, material risk had a significant effect on time (Sig. = 0.017), human resource risk had a significant effect on quality (Sig. = 0.018), and economic risk had a significant effect on cost (Sig. = 0.016). The FTA results indicated that the risks with the highest probabilities of occurrence were lack of workforce competency (10.2%), difficulties in project financing (9.6%), and delays in material delivery (5.0%). Risk mitigation strategies should prioritize improving workforce competency, strengthening material management, enhancing project financial control, and improving coordination in managing design changes to improve schedule performance, quality, and cost efficiency in MRT and LRT construction projects in Jakarta.
References
[1] T. Trijeti, A. Madeppungeng, R. S. Rasul, and R. Irwanto, “Risk Management in the Jabodebek Lrt (Light Rail Transit) Devel-Opment Project, in Jakarta and Its Neighbouring Cities,” Int. J. Civ. Eng. Infrastruct., vol. 2, no. 1, p. 70, 2022, doi: 10.24853/ijcei.2.1.70-87.
[2] R. F. Ashadi, Z. Citra, and I. P. Sari, “Penilaian Risiko Proyek Infrastruktur Kereta Api Cepat Jakarta – Bandung,” Cived, vol. 10, no. 2, pp. 564–577, 2023, doi: 10.24036/cived.v10i2.413.
[3] P. F. Marzuki, R. Tamin, and I. Maharani, Manajemen Risiko dalam Proyek Konstruksi. Bandung: ITB Press, 2023. [Online]. Available: https://www.itbpress.id/product/manajemen-risiko-dalam-proyek-konstruksi/
[4] PMI Indonesia Chapter, Pedoman Kerangka Ilmu Manajemen Proyek PMBOK Guide. Jakarta: PMI Indonesia Chapter, 2018.
[5] SNI ISO 31000, Manajemen Risiko Berbasis SNI ISO 31000, vol. 11, no. 1. 2018. [Online]. Available: http://scioteca.caf.com/bitstream/handle/123456789/1091/RED2017-Eng-8ene.pdf?sequence=12&isAllowed=y%0Ahttp://dx.doi.org/10.1016/j.regsciurbeco.2008.06.005%0Ahttps://www.researchgate.net/publication/305320484_Sistem_Pembetungan_Terpusat_Strategi_Melestari
[6] A. Asmi, M. G. Rahmadi, and A. Djamaris, “Risk Analysis of Construction Delays in High-Rise Projects,” Int. J. Multidiscip. Res. Anal., vol. 08, no. 08, pp. 4644–4648, 2025, doi: 10.47191/ijmra/v8-i08-28.
[7] S. Arikunto, Prosedur Penelitian Suatu Pendekatan Praktik, 15th ed. Jakarta, 2013.
[8] M. Wijayaningtyas, Y. M. Orissa, and M. Munasih, “The Application of Analytical Hierarchy Process (AHP) to Determine The Construction Project Risk,” E3S Web Conf., vol. 476, 2024, doi: 10.1051/e3sconf/202447601060.
[9] R. K. Mussa, C. Yeom, and S. Lee, “Analysis of Risk Factors associated with Railway Projects in Tanzania,” Open Transp. J., pp. 1–10, 2023, doi: 10.2174/18744478-v17-230831-2023-15.
[10] N. E. Pratiwi, T. Immawan, D. Handayani, and A. Fole, “Implementasi Metode ISO 31000 : 2018 dalam Perancangan Mitigasi Risiko pada Proyek Depo Lokomotif Maros - Sulawesi Selatan,” Integr. J. Ilm. Tek. Ind., vol. 09, no. 02, pp. 136–147, 2024, doi: https://doi.org/10.32502/i ntegrasi.v9i2.187.
[11] R. Abrar, Nisrina; Tamin, “Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) Pembangunan Skybridge Stasiun Kiaracondong,” J. Civ. Eng. Build. Transp., vol. 8, no. 2, pp. 190–197, 2024.
[12] M. U. Nurjanah, S. W. Astuti, and M. Nurhadi, “Analisis Risiko Pekerjaan Erection Jembatan Kereta Api Menggunakan Metode Fuzzy FMEA,” J. Komposit J. Ilmu-ilmu Tek. Sipil, vol. 8, no. 1, pp. 163–170, 2024, doi: https://doi.org/10.32832/komposit.v8i1.15165.
[13] J. W. Wepari, M. B. Donkor, and E. Kusi, “Mitigating the effects of delay risk in building construction projects in Ghana,” Cogent Eng., vol. 11, no. 1, p., 2024, doi: 10.1080/23311916.2024.2345522.
[14] D. T. Hai and N. T. Thuy, “Evaluating Risk Management Perspectives of Parties in Construction Projects Funded by Vietnam Government’s Budget,” Open Constr. Build. Technol. J., vol. 16, no. 1, pp. 1–9, 2022, doi: 10.2174/18748368-v16-e221117-2022-11.
[15] D. B. Chattapadhyay, J. Putta, and P. Rama Mohan Rao, “Risk identification, assessments, and prediction for mega construction projects: A risk prediction paradigm based on cross analytical-machine learning model,” Buildings, vol. 11, no. 4, 2021, doi: 10.3390/buildings11040172.
[16] S. Chen, X. Luo, X. Li, and X. Fu, “Risk Management of Road Engineering Project Based on Analytic Hierarchy Process,” Tech. Ga, vol. 29, no. 2, pp. 363–368, 2022, doi: 10.17559/TV-20210410091404.
[17] A. Sa’dl Issa Alkhawaja and I. F. Varouqa, “Risks management of infrastructure line services and their impact on the financial costs of road projects in Jordan,” Meas. Sensors, vol. 25, no. November 2022, p. 100647, 2023, doi: 10.1016/j.measen.2022.100647.
[18] L. B. Setyaning, E. Riyanto, and A. Prasetyo, “Analisa Manajemen Risiko pada Proyek Pembangunan Jalan Tol Yogyakarta-Bawen,” Apl. Tek. Sipil, vol. 21, no. 4, pp. 397–404, 2023, [Online]. Available: http://iptek.its.ac.id/index.php/jats
[19] H. N. Ardiyanti, H. Acep, and M. Amin, “Risk Management Analysis in Spald-T Project: A Case Study in DKI Jakarta,” J. Pensil Pendidik. Tek. Sipil, vol. 14, pp. 20–29, 2025, doi: 10.21009/jpensil.v14i1.47879.
[20] H. Aladağ, “Assessing the Accuracy of ChatGPT Use for Risk Management in Construction Projects,” Sustain., vol. 15, no. 22, 2023, doi: 10.3390/su152216071.
[21] P. Kumar and R. Mk, “Advances in Consumer Research Enhancing Construction Workforce Efficiency through Digital Training : An Empirical Study,” Adv. Consum. Res., vol. 2, no. 4, pp. 4645–4652, 2025.
[22] A. Bongawali et al., “Evaluasi Optimalisasi Cash Flow pada Proyek Multiyears dengan Penyesuaian Perubahan Waktu Pelaksanaan (Studi Kasus Proyek Pembangunan Jalur Kereta Api Lintas Makassar-Pare pare),” J. Sci. Mandalika, vol. 6, no. 3, pp. 507–516, 2025.
[23] M. Juan and F. Jie, “Cleaner Logistics and Supply Chain Mitigating the supply chain uncertainties and risks in the construction projects : Case studies of Australian construction projects,” Clean. Logist. Supply Chain, vol. 16, no. June, p. 100237, 2025, doi: 10.1016/j.clscn.2025.100237.
[24] W. Widanengsih, I. Widiaty, L. Widaningsih, and Y. Yusof, “Mapping Construction Workforce Competencies for Blue Infrastructure: Scopus AI-Based Literature Review,” Innov. Vocat. Technol. Educ., vol. 2, pp. 102–114, 2025.
[25] M. Soliman, M. Bolpagni, N. Thurairajah, and L. F. Perez, “Predicting Implications Design Change in BIM-Based Costruction Project Through Machine Learning,” Autom. Constr., vol. 155, no. 11, p. 105057, 2023, doi: https://doi.org/10.1016/j.autcon.2023.105057.
[26] A. Premakumara and C. Siriwardana, “A comprehensive approach for assessing the causes of low productivity in the construction sector : a systematic categorization and ranking using Pareto and Fuzzy analysis,” Constr. Manag. Econ., vol. 43, no. 1, pp. 40–58, 2025, doi: 10.1080/01446193.2024.2377712.
[27] I. Prasetyo, H. Dani, and R. Zulfikar, “Factors influencing construction worker productivity in Indonesia and strategies for improvement,” Multidiscip. Sci. J., no. 1, pp. 1–10, 2025.
[28] A. S. Bageis, “An Investigation into the Causes of Payment Delays and Saudi Arabia,” MDPI Build., vol. 14, no. 1792, pp. 1–25, 2024, doi: https://doi.org/10.3390/buildings14061792.
[29] D. G. Italiya and S. Year, “A Comprehensive Review of Cost Overrun Factors in Construction Projects,” Int. J. Sci. Res. Eng. Manag., vol. 09, no. 11, pp. 1–14, 2025, doi: 10.55041/IJSREM53645.
[30] H. A. Rani, T. Syammaun, F. Rachman, and J. Amin, “Optimization of Construction Material Inventory Using Material Requirement Planning,” J. Linears, vol. 8, no. 1, pp. 1–7, 2025.
License
Copyright (c) 2026 Achmad Fajar Malik, Hermanto Dwiatmoko

This work is licensed under a Creative Commons Attribution 4.0 International License.