1.
Ilmi Azhara U, Sagita Riantini Supriadi L, Latief Y. Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance. IJSE [Internet]. 2026 Feb. 5 [cited 2026 Feb. 5];6(1):730-41. Available from: https://ijsenet.com/index.php/IJSE/article/view/399