Ilmi Azhara, Ulya, Leni Sagita Riantini Supriadi, and Yusuf Latief. “Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance”. International Journal of Science and Environment (IJSE) 6, no. 1 (February 5, 2026): 730–741. Accessed February 5, 2026. https://ijsenet.com/index.php/IJSE/article/view/399.