Ilmi Azhara, Ulya, et al. “Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance”. International Journal of Science and Environment (IJSE), vol. 6, no. 1, Feb. 2026, pp. 730-41, doi:10.51601/ijse.v6i1.399.