[1]
U. Ilmi Azhara, L. Sagita Riantini Supriadi, and Y. Latief, “Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance”, IJSE, vol. 6, no. 1, pp. 730–741, Feb. 2026.