Ilmi Azhara, U., Sagita Riantini Supriadi, L. and Latief, Y. (2026) “Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance”, International Journal of Science and Environment (IJSE), 6(1), pp. 730–741. doi: 10.51601/ijse.v6i1.399.