Ilmi Azhara, Ulya, Leni Sagita Riantini Supriadi, and Yusuf Latief. 2026. “Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance”. International Journal of Science and Environment (IJSE) 6 (1):730-41. https://doi.org/10.51601/ijse.v6i1.399.