ILMI AZHARA, Ulya; SAGITA RIANTINI SUPRIADI, Leni; LATIEF, Yusuf. Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance. International Journal of Science and Environment (IJSE), [S. l.], v. 6, n. 1, p. 730–741, 2026. DOI: 10.51601/ijse.v6i1.399. Disponível em: https://ijsenet.com/index.php/IJSE/article/view/399. Acesso em: 5 feb. 2026.