Ilmi Azhara, U., Sagita Riantini Supriadi, L., & Latief, Y. (2026). Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance. International Journal of Science and Environment (IJSE), 6(1), 730–741. https://doi.org/10.51601/ijse.v6i1.399