(1)
Ilmi Azhara, U.; Sagita Riantini Supriadi, L.; Latief, Y. Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance. IJSE 2026, 6, 730-741.