[1]
Ilmi Azhara, U. et al. 2026. Development of A Time and Cost Control System For The Construction of A Ø1000 Mm Pipe Bridge Based on A Work Breakdown Structure (WBS) Integrated With A 3d Model and Bim to Improve Time and Cost Performance. International Journal of Science and Environment (IJSE). 6, 1 (Feb. 2026), 730–741. DOI:https://doi.org/10.51601/ijse.v6i1.399.